The new Beaulieu Park station has now officially opened ahead of its construction schedule, making transport north east of Chelmsford much easier. The station is making history as the first on the Great Eastern Main Line in over a century.
Plaque unveiled
It was officially opened on Monday 27 October by Rail Minister Lord Hendy, Essex County Council Deputy Leader Louise McKinlay, and local MP James Cleverly. They unveiled a plaque commemorating the station opening on the 200th anniversary of passenger rail, as the Chelmsford Silver Band played ‘Ticket to Ride’ by The Beatles.



Excitement
The station had actually already opened for travellers on Sunday 26 October, with the first train stopping at 7.20am.
I went along to Beaulieu Park (pronounced ‘Bewley’) on Sunday to witness the excitement – travelling by train, of course!
There were lots of people there, just sniffing the air and soaking up the enormity of the moment. The enthusiasm was palpable.
Worth travelling for
I asked some why they had come. Most had just gone along to see the station and weren’t purposefully travelling anywhere. Many had bought a ticket to nearby stations Witham or Chelmsford just for the experience of travelling in and out of the station.
I spoke to others who’d come further – Waltham Cross, Cambridge, Colchester and London, just to have a nose.
There were rail enthusiasts aplenty – these days it looks like they film or photograph everything rather than noting it down – but also many local residents.
A staff member described the 7am throng waiting outside the doors. On opening there was a surge to the ticket machines to be the first to get a ticket saying ‘Beaulieu Park’.
He’d also seen plenty of rail enthusiasts and Youtube ‘influencers’ who’d recorded the day on film for their followers, like this one.
Security guards were employed to hold back the platform crowds, and as you can see, they were needed!
The station
First impressions: it’s big. Wide platforms, long enough for 12-car trains. Compared to Chelmsford it’s cavernous. Chelmsford is the busiest two-track station outside London and being on railway arches has no room to expand.
Beaulieu Park has plenty of space.
There’s a huge hall but no ticket office. Customer service assistants help passengers with ticket machines. There were many staff there for the opening, and one employee told me it was her first day working for Greater Anglia. “I’m so excited to have been posted here,” she said.



Environmentally-conscious features
When I wrote the first Beaulieu Park article, readers asked if it had sustainable features. So I asked Network Rail, and the response was yes:
- Low carbon cement which saved over 60,000 tonnes of CO2 compared with conventional building materials
- Solar panels on the roof, double glazing, LED lighting, smart controls on energy-efficient machines
- Outside, excess floodwater will be dealt with by Sustainable Urban Drainage (SUDS) permeable paving and a drainage pond
- Bike storage for 500 cycles within a secure bike cage. Improvements to local walking and cycling routes with new paths created
- Over 700 parking spaces, and a bus hub where several buses call, making it easier to arrive there without a car
A Network Rail spokesperson added: “Included is provision for EV charging for ten vehicles, as well as the planting of hundreds of young trees around the site to create a welcoming setting for all station users.”
A new transport hub for north east Chelmsford
Beaulieu Park has a central loop platform, allowing fast trains to pass while other services stop there.
You can travel to London Liverpool Street in 40 minutes and to Chelmsford in four minutes.
Operated by Greater Anglia, the station will ease pressure on Chelmsford’s existing station and reduce car journeys into the centre.
It should provide quicker access to jobs, encouraging local economic development and further investment.
It was funded with £175million, including £141m from the Government’s Housing Infrastructure Fund, £12m from the South-East Local Enterprise Partnership and £22m from developers Countryside (part of Vistry) and L&Q.
Construction took under three years. A time-lapse video of the complete process can be seen here.
Beaulieu Park will be a garden community of 10,000 new homes – including almost 2,000 plus link roads already built.
Here’s a guide to the station facilities.
Inclusive designs
Accessible features include:
- Step-free access to all platforms via two lifts
- Accessible toilets, baby-change facilities
- 38 designated Blue Badge bays free of charge
- Braille signs
- Ticket machine instructions available in various languages
- Two wide ticket barrier entry/ exit gates (one in, one out). A staff member who’s worked at Chelmsford station told me that this is really helpful: “At Chelmsford there’s only room for one and you have to keep changing its direction.”



Local opinion
A local woman from Springfield told me: “It’s crowded today, but building it up might be a slow burn, as more houses are built on the estate and they start to use it to get to London. Also people will like not having to drive into Chelmsford – traffic is terrible and there’s no parking at that station. It’s the future really, isn’t it? We can’t go on using more and more cars.”
“I live between here and Chelmsford,” a Broomfield man said. “I’ll probably come here now – traffic will be less.”
A local parent told me: “My children have been excited watching it grow over the last two years, so we had to come today to have a look. It seems enormous to them! But they’ve got really interested in trains because of it.”
A steam train was parked at Platform 3 for a couple of hours on Monday morning, cleverly timed for local youngsters on half term holiday.
The future
It’s been a busy time for Greater Anglia. East Anglia Bylines wrote about this historic development in September. In early October we covered the nationalisation of the company, right after it won a national prize for performance.
On my visit, I found universal enthusiasm and ‘good vibes’. It enables easier car-free travel. The building – the roof at least! – is attractive. It was built quickly, the opening went smoothly and there was an air of efficiency.
Perhaps we can do infrastructure well.











