One of East Anglia’s busiest railway depots has opened its gates to the public for the first time since 1992. More than 1,200 railway enthusiasts, families and local residents visited Greater Anglia’s Crown Point depot in Norwich on Saturday 6 June, taking advantage of a rare opportunity to explore a working railway facility normally closed to the public.
Visitors were able to climb aboard modern Greater Anglia trains, tour drivers’ cabs and learn more about the engineering work that keeps services running across the region. A 12-carriage Class 745 intercity train was on display alongside several Class 755 bi-mode trains, while railway staff explained the role of traction motors, wheelsets, engines and other key components used on the network.

The depot also welcomed a range of visiting locomotives with strong East Anglian connections. Among the most popular attractions were cab tours of Class 37 and Class 56 freight locomotives from Colas Rail Freight, a Freightliner Class 90 locomotive that once hauled Norwich-to-London intercity services, and the Wissington steam engine from the North Norfolk Railway.

A Class 08 shunting locomotive, used to move trains around the depot at low speed, was also on display, while a small steam-powered road train offered children and adults alike a chance to take a leisurely trip around the site.
Railway community comes together
The event brought together railway organisations from across the region, reflecting the close links between the modern railway and East Anglia’s rail heritage.
Representatives from the Bure Valley Railway, Mid-Norfolk Railway and the Bittern and Wherry Lines Community Rail Partnerships were among those attending, alongside members of the Norwich Model Railway Club, who displayed several model railway layouts. British Transport Police officers also took part, showing visitors one of their vehicles and explaining their role in keeping passengers and railway staff safe.
Helen Dickerson, Crown Point’s Yard Operations Manager, says it was a pleasure to welcome visitors into the depot and showcase the work carried out behind the scenes. She says the locomotives and engines on display came from near and far but all had strong East Anglian connections, reinforced by the involvement of local heritage railways, community rail partnerships and industry organisations.
“There was a great buzz throughout the day, and Greater Anglia and Network Rail teams were only too happy to talk to visitors about their roles and provide tours of the train cabs, yard controller offices and signal box,” she says.
Steve Mitchell, Greater Anglia’s Head of Engineering and Assurance, says the open day provided a rare chance to showcase the work that goes into keeping trains running safely and reliably.
“It was a brilliant opportunity to show the skill, care and teamwork that goes into preparing trains for passenger service,” he says, adding that he hopes the event inspired some visitors to consider a future career on the railway.

A depot at the heart of East Anglia’s railway
Crown Point depot has been at the centre of East Anglia’s railway operations for more than four decades. The first public open day at the site took place on 30 May 1987 to celebrate the completion of the electrification of the Great Eastern Main Line, while the last public open day before this month’s event was held on 3 October 1992.
The depot itself opened on 27 October 1982, replacing Norwich engine shed and creating a central servicing location for intercity trains that had previously been maintained at Great Yarmouth. It was electrified in 1986–87 as work to modernise the Great Eastern Main Line reached completion.
Today, more than 100 Greater Anglia employees are based at Crown Point, although the wider workforce is larger due to the presence of train manufacturer Stadler. Around 70 Greater Anglia maintenance roles transferred to or were seconded to Stadler as part of the introduction of the company’s new train fleet and a major depot modernisation programme.
The depot services up to 27 trains every 24 hours. Greater Anglia staff oversee engineering support, train presentation and yard operations, carrying out essential tasks including refuelling, cleaning and sanding trains before they return to service across the East of England.
The open day also highlighted the close working relationships across the railway industry, bringing together Greater Anglia and Network Rail teams alongside heritage railways, community rail partnerships and freight operators.
It comes as c2c, Greater Anglia and Network Rail Anglia continue to come together as GBR Anglia, bringing track and train closer together to improve planning, strengthen day-to-day coordination and deliver a more joined-up railway for passengers across the region.
For one day, however, the focus was less on organisational change and more on giving the public a rare chance to step behind the scenes and see the people, machinery and expertise that keep East Anglia’s trains moving.
This article is based on a press release from Greater Anglia, compiled with assistance from AI tools and edited by East Anglia Bylines.
More from East Anglia Bylines

Bylines Network Gazette is out!
The latest Bylines Network Gazette is out now. Become a Friend of Bylines Network or upgrade to a paid Substack subscription, and you will get access to a vital collection of citizen articles and stories.
Journalism by the people, for the people.










