• Contact
  • About
  • ISSN 3049-9771
  • Authors and editors
NEWSLETTER SIGN UP
East Anglia Bylines
Advertisement
  • HOME
  • News
    • Brexit
    • Health
    • Education
    • World
  • Politics
    • Local government
    • Justice
    • Activism
  • Climate
    • Environment
  • Lifestyle
    • Community
    • Culture
    • History
    • Humour
    • Property
  • Business
    • Development
    • Economics
    • Finance
    • Transport
    • Farming
  • ANGLIA
    • Bedfordshire
    • Cambridgeshire
    • Essex
    • Hertfordshire
    • Norfolk
    • Suffolk
  • Series
No Result
View All Result
  • HOME
  • News
    • Brexit
    • Health
    • Education
    • World
  • Politics
    • Local government
    • Justice
    • Activism
  • Climate
    • Environment
  • Lifestyle
    • Community
    • Culture
    • History
    • Humour
    • Property
  • Business
    • Development
    • Economics
    • Finance
    • Transport
    • Farming
  • ANGLIA
    • Bedfordshire
    • Cambridgeshire
    • Essex
    • Hertfordshire
    • Norfolk
    • Suffolk
  • Series
No Result
View All Result
East Anglia Bylines
Home REGIONS Anglia

Pylons and trenches: speed before the environment?

To get faster to net zero, Government plans to sacrifice the rural environment, with unnecessary trenches and pylon lines

Stephen McNair by Stephen McNair
21 July 2022
in Anglia, Energy, Environment, Essex, Norfolk, Suffolk
Reading Time: 7 mins read
A A
East Anglia One windfarm.

East Anglia One windfarm. Photo by Trommens via Wikimedia Commons (CC BY-SA 4.0)

Share on Bluesky

Offshore wind energy has been the surprise success of government energy policy. The east coast has been a leading contributor. But as so often, a lack of strategic planning, and competing commercial incentives are throwing up problems. There is growing resistance to the planned pylon lines from Norwich to Tilbury, but less attention has been given to how the power gets from the coast to Norwich.

Offshore wind has been a surprise success

Offshore wind farms are growing rapidly, and making a real contribution to plans for the UK to achieve net zero carbon emissions by 2050. In 2009, only 2 percent of the UK’s electricity was generated from wind. By 2020 that had risen to 24 percent, well above the government’s 20 percent target. The cost per Kilowatt Hour (kWh) has fallen dramatically. Although wind energy can only be a part of our energy mix (since the wind doesn’t blow all the time), this is a major contribution to our net zero ambitions.

In 2019 the Hornsea One windfarm was the first to generate over 1 gigawatt of electricity, enough to power a million homes. The three projects recently approved off the Norfolk coast will each generate twice that, and there are more in the pipeline. The location and current generation of offshore sites can be seen here.

The government now plans for 40 gigawatts of offshore wind generation by 2030 and 75 gigawatts by 2050.  In response, a growing list of developers are preparing plans for new offshore windfarms. But every new project has to bring its electricity ashore and connect to the National Grid.

And there two green agendas collide.

Digging the cable routes

Windfarm-trench-diggingSheringham-cable-trench
Preparing cable trench at Sheringham: Photo by Evelyn Simak/ CC BY-SA 2.0

The east coast is prime territory for wind farms, but it seems that government did not anticipate the speed of growth, with multiple separate projects all going ahead at once. Each of these has its own plans for connecting to the national grid, each coming ashore in a different place. The result looks like being an environmental blow, especially for Norfolk, where there are currently five proposals under development.

Connecting to the National Grid means laying heavy cables to Norwich, where they will connect to the unpopular pylon lines, which will take it to join the main grid at Tilbury.  

On current plans, in Norfolk, this means clearing three strips of land 40 miles long and over 40 metres wide (the width of a motorway). During the work there will be heavy construction traffic across much of the rural north of the county. Local councils claim that, on a “realistic worst-case scenario”, there could be 1000 HGV movements a day on often narrow roads. When finished there will be restoration work, but restoring rural ecosystems takes decades, not months.

And this is not an issue for Norfolk alone. Similar issues arise in Suffolk, where a series of similar projects is in progress. And there is growing public opposition to the pylon lines, which will cut across rural Suffolk and Essex, including some protected Areas of Outstanding Natural Beauty.

There is concern about this in Parliament and a national Off Shore Electricity Grid Task Force (OffSET) of MPs and County Councillors, led by Bernard Jenkin (Harwich) and Jerome Mayhew (Broadland). has been formed to argue for better solutions.

There is a better answer

And protests are growing, especially against the proposed pylon lines.  Both sets of protestors  support offshore wind energy. They stress that this is not a “not in my backyard” objection, because there is an alternative, which has been proposed and developed by National Grid.

Pylons in Waveney Forest
Pylons in Waveney Forest. Photo by Evelyn Simak via Geograph (CC BY-SA 2.0)

This is an offshore “ring main” round the east coast, linking to the grid at the Humber or the Thames, where the onshore grid infrastructure is already in place. Each windfarm would then connect to the main at sea, removing the need for trenches and pylon lines across the landscape.

The National Grid’s feasibility study for this Holistic Design Network suggested that if this model were implemented by 2025, it could save £6 billion, halve the length of onshore cables, and be very much less socially and environmentally damaging than the current plans.

However, the technology is still developing, the planning is inevitably complex, and takes time. The National Grid’s Offshore Coordination Project completed a consultation on plans for this Holistic Design Network (HND) in June. However, the Secretary of State, in a detailed 60 page approval letter for the Vattenfall Vanguard project, concluded that speed should take priority over the concerns of local people .

The Secretary of State has balanced the substantial harm arising from landscape and visual issues against the substantial and pressing need for renewable electricity sources and considers that the latter should prevail. He does not consider that his decision should be deferred or that the onshore elements should be refused pending the outcome of the OTNR [Offshore Transmission Network Review].

It is, of course, possible that a new Prime Minister, or Secretary of State, may want to review this decision.

The best answer, or the quickest?

The three projects already approved (Orsted’s Hornsea 3, and Vattenfall’s Boreas and Vanguard) all hope to be operational within 4 years, and there are a further three planning to complete between 2027 and 2033. Understandably, they are reluctant to delay, and if they do, the government may miss its 2030 targets for wind generation.

Government is “encouraging” the companies planning new projects to opt in to the emerging HND system. It remains to be seen whether they decide to do so. Local people along the 120 miles of potential cable trenches, and the 112 miles of pylon lines, and the councils campaigning to change the plans hope that they can be persuaded.


More from East Anglia Bylines

Aldham against pylons.
Anglia

Pylon campaigners slam National Grid’s report in offshore network plea

by Jenny Rhodes
17 July 2022
The Kerch Bridge after Ukraine's missile strike, showing the surviving railway arch and the collapsed road bridge, with broken sections of roadway lying in the water.
Featured

Ukraine has the cards – and the internet is playing them

by East Anglia Bylines
18 November 2026
Person on wheelchair at the foot of two steps and two escalators either side of a fixed staircase.
Community

Accessible in theory, inaccessible in practice: does the law help?

by Bob Cronk
17 November 2026
Home Secretary Shabana Mahmood speaking at a conference
Employment

The Mahmood immigration plan: what exactly is the point?

by Stephen McNair
17 November 2026
East Anglian Air Ambulance clinician in orange uniform and blue gloves operating a handheld i-STAT Alinity blood analyser, with medical equipment beside them.
Anglia

How East Anglia’s air ambulance is taking hospital medicine to the roadside

by East Anglia Bylines
16 November 2026

Tags: ClimateEnvironmentGreen energyNational Grid
Previous Post

As the ERG acclaim Truss their champion, Sunak will need to risk splitting his party in order to win

Next Post

Patel snubs select committee as documents condemn “inexcusably awful” refugee response

Stephen McNair

Stephen McNair

Stephen McNair is a member of the EAB editorial team, living in Norfolk. Now retired, he spent most of his career working on education policy, especially learning and work, at local, national and international level. He is Emeritus Professor of Education at the University of Surrey, and previously a Director of the National Institute for Adult Continuing Education. After 'retiring' he spent five years chairing a European research committee on demographic change.

Related Posts

East Anglian Air Ambulance clinician in orange uniform and blue gloves operating a handheld i-STAT Alinity blood analyser, with medical equipment beside them.
Anglia

How East Anglia’s air ambulance is taking hospital medicine to the roadside

by East Anglia Bylines
16 November 2026
A pile of illegally dumped building materials, cardboard, plastic and household waste beside a track through farmland in Norfolk.
Justice

Fly-tippers caught in undercover Norfolk operation

by East Anglia Bylines
16 November 2026
A child holds up a sign that reads, "Clean Our Future", at a Global Strike for Climate Justice
Activism

“Climate of Denial” – a song for a better future

by Marchie
15 November 2026
Peterborough prison aerial view. Geometric buildings some a solid shape, one a cross shape, one a 5-pointed star, all encircled by a wall and within it a fence. Beyond the prison the photo shows parts of Peterborough, and the railway main line runs across the bottom right-hand corner of the image.
Anglia

The growing crisis behind prison walls

by J.J. Jackson
15 November 2026
Police officers on patrol entering a Chelmsford venue. They are outside a supermarked and there are quite a few young people around. Faces are blanked out.
Community

Chelmsford extends funding for extra weekend police patrols

by East Anglia Bylines
14 November 2026
Next Post
Priti Patel

Patel snubs select committee as documents condemn “inexcusably awful” refugee response

SUPPORT OUR CROWDFUNDER

Tags

Activism Brexit Cartoons Christmas Climate Community Conservation Conservatives Democracy Economy Elections Environment EU Farming General Election 2024 Government Health History Housing Labour Letters Local government Net zero NHS Norwich Opinion Our place in Europe Party politics Pecksniff Politics Polling Pollution Poverty Reform UK Renewables Sewage Social care Something for the weekend Tax Trump Ukraine Voting Wealth Wildlife Women
East Anglia Bylines

We are a not-for-profit citizen journalism publication. Our aim is to publish well-written, fact-based articles and opinion pieces on subjects that are of interest to people in East Anglia and beyond.

East Anglia Bylines is a trading brand of Bylines Networks Limited which is separate to, but allied with, Byline Times.

Learn more about us

No Result
View All Result
  • About
  • Authors and editors
  • Complaints
  • Contact
  • Donate
  • Letters
  • Privacy
  • Network Map
  • Network RSS Feeds
  • Submission Guidelines
  • Download the Bylines Network App

© 2021-2026 East Anglia Bylines. Powerful Citizen Journalism. ISSN 3049-9771

No Result
View All Result
  • HOME
  • News
    • Brexit
    • Health
    • Education
    • World
  • Politics
    • Local government
    • Justice
    • Activism
  • Climate
    • Environment
  • Lifestyle
    • Community
    • Culture
    • History
    • Humour
    • Property
  • Business
    • Development
    • Economics
    • Finance
    • Transport
    • Farming
  • ANGLIA
    • Bedfordshire
    • Cambridgeshire
    • Essex
    • Hertfordshire
    • Norfolk
    • Suffolk
  • Series

Newsletter sign up

Crowdfunder

© 2021-2026 East Anglia Bylines. Powerful Citizen Journalism. ISSN 3049-9771